Construction Update:
Construction crews continue selective demolition of the former Orthopedics Clinic space in the ANMC hospital, which will be ongoing for several weeks.
Ongoing work for the interior framing and gypsum wall board installation, taping and painting, and the installation of plumbing and ducting continues. The electrical crew is finalizing the rough-in for the gypsum wall board close up.
Crews have started their demolition of concrete curbs and asphalt, and footers and columns for the new Temporary ED entry canopy have been poured. Steel erection for the new Temporary ED canopy began this week.
Parking Update:
On Saturday, June 22, construction crews will extend their construction fence and take over existing ADA accessible parking spots in front of the Southeast side of the ANMC hospital. The green highlight in the graphic shows where the fence will be extended and the ADA accessible spots that will be impacted. The 11 impacted ADA accessible spots will be relocated to the other side of the parking area, as shown by the red block.